Introduction
Southern Plumbing Plus Facility Design
Environmental best practice principles were adopted throughout the design and construction of the Corporate Headquarters for SPP complex in Fyshwick, comprising of a Warehouse (1500m2), Trade Centre (1000m2), Administration (400m2) and Showroom (800m2). Long-term energy saving measures were utilised such as: solar panels for hot water; solar shading and natural ventilation; accurate environmental building orientation and spatial planning; and stormwater harvesting (irrigation, flushing of toilets and truck washing).